
Production Base Overview
A 50,000 m² site in the Puyang Zhongyuan Dahua chemical industry park in Henan Province with six dedicated lines, centralised DCS control, automated packing and separated storage zones.
Licensed chemical industry park plot in Puyang, Henan
Including the dedicated cyanuric acid line
Annual output of the dedicated cyanuric acid line
Six Controlled Stages, One Batch Record
Every batch passes through the same documented stages. Hover or tap a stage to see what is controlled and recorded.
Raw Material Intake
Every inbound lot is sampled and checked against specification before being released to the warehouse.
Reaction & Processing
Temperature, pressure and feed rate are recorded automatically by the DCS system for each batch.
Purification
Filtration, crystallisation and distillation stages remove impurities to the contracted grade.
In-Process Testing
QC samples each batch for purity, moisture, pH and heavy metals before release to packing.
Packing
Automated filling lines handle 25 kg bags and 500 kg / 1,000 kg jumbo bags.
Dispatch & Documentation
COA, packing list and MSDS travel with every shipment; retention samples are kept for 24 months.
Batch records link raw material lots, in-process parameters, QC results and dispatch documents under one batch number. Customers can request the full record during supplier audits or when investigating a quality question.
Main Production and Control Equipment
Reaction, drying, packing and control equipment maintained on a scheduled programme with documented calibration.




Storage and Delivery Capability
Separated storage zones, qualified dangerous goods carriers and scheduled export shipments from Shanghai and Ningbo.
Finished goods warehouse
3,000 t storage18,000 m² covered warehouse with separated zones for alkalis, acids, oxidisers and general chemicals.
Domestic distribution
48 h loadingQualified carriers for general and dangerous goods, with loading scheduled within 48 hours of order release.
Export shipments
Global exportFCL and LCL export from Shanghai and Ningbo ports, UN-certified packing and GHS-compliant labelling.
Delivery scheduling
5 - 25 daysStocked items ship in 5 to 7 working days; made-to-order batches take 15 to 25 working days.
Planning a supplier audit or factory visit?
We welcome customer audits at the production base. Share your checklist in advance and we will prepare the corresponding quality, safety and environmental records.